Volume 96

Southern Steam Finale No.9 (60-mins) Price £19.75

The final weeks of Southern Region steam in June and July 1967 covered in depth. Normal running over the main line from Waterloo to Weymouth with the remaining Bulleids and Standards is portrayed. There are shed visits to Nine Elms and Weymouth as engines are prepared for their last turns and for some the last ever. Railtours are seen with the visit of 4498 SIR NIGEL GRESLEY to the region for a tour to Weymouth and is covered by nine different cameramen en route. The two BR specials hauled by Merchant Navies and two Society tours, the last one visiting Haslemere bank and the Swanage bank sometimes utilising double heading. The last weeks’ trains including running at 97 m.p.h. from the footplate. There were failures too. The last day of steam as the final up steam-hauled train came up from Weymouth whilst other engines were steaming off to withdrawal at Salisbury. This video is different. This is how it really was at the end. It is not just a succession of runpasts, we also concentrate on detail.

Click Here for the “Southern Steam Finale” DVD Series

Click here to order this and other videos online

(By clicking here you are entering Wolverton Rail Videos web site with over 4000 transport videos & DVDs available

‘Run by Enthusiasts for Enthusiasts since 1987′.

Please note you will be buying from Wolverton Rail and not B & R Video Productions)

This entry was posted in Southern Steam Finale, Volumes 90-100 and tagged , , , , , , , . Bookmark the permalink.

Leave a Comment

(Please note all enquiries are handled by Wolverton Rail)

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>